Cost estimating can be regarded as the approximation of the costs of any project or operation. It's a very broad subject and can be applied in any field. Yet it's those projects with relative high complexity and uncertainty that require most attention, since these are often associated with high investment costs. It is therefore common practice for companies to acquire external estimating knowledge and skills for that kind of projects in case they don't have dedicated cost estimators in-house. The cost estimating services provided by Cost Engineering comprise of experienced and qualified cost engineers with a cost estimating and a functional engineering background. Those services aim to either assist companies in their cost estimating processes, check their work to ensure they're correct, or to take care of all estimating activities throughout the entire project. The preparation of cost estimates will range from the AACE International (AACEI) Class 5 Project initiation cost estimates through cost estimate AACEI Class 1 detail estimates. A full description of these classes, developed by the international association of cost engineering (AACE International), can be found here. A short summary: Estimate Level Level of Project definition Expected Accuracy Range Preparation Effort L: -20% to -50% H: +30% to +100% 1 L: -15% to -30% H: +20% to +50% L: -10% to -20% H: +10% to +30% L: -5% to -15% H: +5% to +20% L: -3% to -10% H: +3% to +15% Cost estimates made by Cost Engineering can be created in Excel if that's what you need, but the preferred way is to use a proprietary / licensed cost estimating software tool like Cleopatra Enterprise. The cost estimates will be produced following the appropriate cost estimate approach required for the specific project phase to establish the accuracy requested. Interested in what our cost estimating services can do for you? Use the contact form or send an email directly to contact@costengineering.eu.Cost Estimating Services
Services by qualified cost estimators
Cost Estimate Classification System
Primary Characteristics
Secondary characteristics
End Usage Methodology 5 0% to 2% Concept Screening Capacity factored Parametric Models, Judgement or analogy 4 1% to 15% Study or Feasibility Equipment factored or Parametric Models 2 to 4 3 10% to 40% Budget, Authorization or Control Semi-detailed unit cost with assembly level line items 3 to 10 2 30% to 70% Control or Bid / Tender Detailed Unit Cost with Forced Detailed take-off 4 to 20 1 50% to 100% Check Estimate or Bid / Tender Detailed Unit Cost with Detailed take-off 5 to 100 Key Features of the Service
Contact us
Read More
Related Blogs
Other reading material